Contractors

Built for GCs, remodelers, and site supers.

Preferred Service Agreements built around your schedule, your budget, and your reporting requirements.

Guaranteed 24-hour swaps

Call before 4pm, we swap before 4pm the next business day — written into your PSA.

Volume pricing

PSA rates step down at 4, 8, and 12+ pulls per month.

Digital scale-ticket tracking

Every pull tied to a job code, weight ticket attached in the portal — no paper chase.

LEED-ready diversion reports

Source-separated recovery data by material stream, formatted for LEED MRc credits.

Volume tiers

PSA pricing steps down as your pull volume goes up.

Rates lock for the term of the agreement, and every tier includes source-separated diversion reports backed by scale tickets.

Tier 1

4 pulls / month

Entry PSA rate for steady remodel and small-site volume. Rate locked for the term.

  • Locked rate for the term
  • Guaranteed 24-hour swaps
  • Diversion reports included
Tier 2

8 pulls / month

Mid-volume step-down for crews running multiple active jobs. Rate locked for the term.

  • Locked rate for the term
  • Guaranteed 24-hour swaps
  • Diversion reports included
Tier 3

12+ pulls / month

Best PSA rate for GCs and production builders. Rate locked for the term.

  • Locked rate for the term
  • Guaranteed 24-hour swaps
  • Diversion reports included
The PSA framework

A written agreement that actually protects your schedule.

Every Preferred Service Agreement is a signed, month-to-month contract. No auto-renewal traps. Pull commitments and pricing tiers are locked for the term.

  • Written 24-hour swap SLA
  • Volume tier pricing (4/8/12+ pulls per month)
  • Named account manager with direct line
  • Consolidated monthly invoicing
  • Source-separated diversion report per project
LEED credit support

Diversion data ready for MRc Construction & Demolition Waste Management.

Source separation is documented at the point of sort, not backfilled at the transfer station. Every stream — wood, metal, cardboard, concrete/asphalt — is tied to a weight ticket and a destination facility, ready to attach to your submittal.

Talk to us about a PSA

Fifteen minutes to walk through pull volume, sizes on rotation, and reporting needs.